0 Comentários
Registros Partida
Registro/Tempo/Mapa
Val/M
Feito por
Rival
Escalação
escalação
escalação
Histórico % de êxito dos mapas Últimos 6 meses
Vertigo
78%
Mirage
75%
Nuke
67%
Ancient
67%
Dust II
40%
Overpass
33%
Inferno
24%
Últimos 5 mapas
Vertigo
78%
9
0
Mirage
75%
4
0
Nuke
100%
8
0
Ancient
33%
3
2
Dust II
40%
5
5
Overpass
0%
0
7
Inferno
57%
7
1
Últimos 5 mapas
Vertigo
0%
1
5
Mirage
0%
0
6
Nuke
33%
3
1
Ancient
100%
3
0
Dust II
80%
5
2
Overpass
33%
3
1
Inferno
33%
3
2
Últimos resultados
Frente a frente
Partidas anteriores
- VVlVV
- lVllV
Info
Match analysis of NAVI Javelins vs BIG EQUIPA by the Bo3.gg Team
In the CS2 match between NAVI Javelins and BIG EQUIPA, a series of thrilling battles unfolded with a score of 2-0, on the following maps: Vertigo, Dust II, and victory was secured by NAVI Javelins. The MVP of this match was Danuu.
NAVI Javelins analytics
The team NAVI Javelins secured 25 out of 51 rounds, showcasing their ability to control and adapt to various situations. They won on the maps Vertigo, Dust II. They also successfully set 2 bombs during the match.
The standout players for NAVI Javelins were Danuu contributed 46 kills and vicu contributed 40 kills. Their exceptional skills played a pivotal role in securing the win. Thanks to coordinated effort, the team inflicted 21168 overall damage.
On the defensive side, NAVI Javelins held their ground firmly, successfully defending 15 bomb plants. Their defensive coordination and site control proved to be crucial.
BIG EQUIPA analytics
The team BIG EQUIPA managed to secure 26 out of 51 rounds, but faced challenges in adapting to their opponent's strategies. Capturing 4 plants during the match did not lead the team to victory.
The standout players for BIG EQUIPA were Mariam contributed 42 kills and Zana contributed 36 kills. 17258 of total damage by BIG EQUIPA could not prevent NAVI Javelins from securing the victory
On the defensive side, BIG EQUIPA struggled to hold their ground, successfully defending 15 bomb plants. Their defensive coordination faced challenges, making it difficult to maintain site control.
0 Comentários