Records Match
Record/Time/Map
Val/Avg
Set by
Rival
Fast bomb plant (sec)
00:33s01:27s
Fast bomb plant (sec)
00:25s01:27s
USP damage (avg/round)
13.24.7
Molotov damage (avg/round)
8.42
Smoke thrown on a map
1914.8354
Smoke thrown on a map
2114.8354
Shots (total/round)
12016
Shots (total/round)
8816
Multikill x-
4
Historical Maps winrate Last 6 months
Nuke
67%
Ancient
67%
Overpass
50%
Mirage
40%
Anubis
33%
Inferno
28%
Vertigo
0%
Last 5 maps
Nuke
67%
9
2
Ancient
67%
6
6
Overpass
50%
16
4
Mirage
40%
10
9
Anubis
33%
12
8
Inferno
22%
9
12
Vertigo
0%
0
27
Last 5 maps
Nuke
0%
1
2
Ancient
0%
1
1
Overpass
0%
0
0
Mirage
0%
0
1
Anubis
0%
0
0
Inferno
50%
2
1
Vertigo
0%
0
3
Info
Match analysis of Legacy vs inSanitY by the Bo3.gg Team
In the CS2 match between Legacy and inSanitY, a series of thrilling battles unfolded with a score of 1-0, on the following maps: Nuke, and victory was secured by Legacy. The MVP of this match was dumau.
Legacy analytics
The team Legacy secured 13 out of 21 rounds, showcasing their ability to control and adapt to various situations. They won on the maps Nuke. They also successfully set 1 bombs during the match.
The standout players for Legacy were dumau contributed 21 kills and coldzera contributed 22 kills. Their exceptional skills played a pivotal role in securing the win. Thanks to coordinated effort, the team inflicted 8585 overall damage.
On the defensive side, Legacy held their ground firmly, successfully defending 8 bomb plants. Their defensive coordination and site control proved to be crucial.
inSanitY analytics
The team inSanitY managed to secure 8 out of 21 rounds, but faced challenges in adapting to their opponent's strategies. Capturing 1 plants during the match did not lead the team to victory.
The standout players for inSanitY were prt contributed 16 kills and iDk contributed 15 kills. 7231 of total damage by inSanitY could not prevent Legacy from securing the victory
On the defensive side, inSanitY struggled to hold their ground, successfully defending 7 bomb plants. Their defensive coordination faced challenges, making it difficult to maintain site control.
0 Comments