0 Kommentare
LeistungenMatch
Rekord/Zeit/Karte
Wert/D
Setzen durch
Rivael
Aufstellungen
Aufstellung
Aufstellung
Historisch Karten Gewinnrate Letzte 6 Monate
Vertigo
60%
Mirage
50%
Nuke
36%
Ancient
19%
Anubis
11%
Overpass
7%
Inferno
0%
Letzte 5 Karten
Vertigo
60%
5
0
Mirage
50%
4
3
Nuke
64%
11
1
Ancient
14%
7
4
Anubis
64%
11
1
Overpass
50%
6
1
Inferno
0%
1
7
Letzte 5 Karten
Vertigo
0%
4
1
Mirage
0%
0
2
Nuke
100%
2
0
Ancient
33%
6
0
Anubis
75%
4
2
Overpass
43%
7
0
Inferno
0%
2
1
Letzte Ergebnisse
Kopf an Kopf
Vergangene Spiele
- wlllw
- wlllw
Info
Match analysis of Singularity vs Arctic Raptors by the Bo3.gg Team
In the CS2 match between Singularity and Arctic Raptors, a series of thrilling battles unfolded with a score of 2-1, on the following maps: Vertigo, Anubis, Overpass, and victory was secured by Singularity. The MVP of this match was POLO.
Singularity analytics
The team Singularity secured 41 out of 80 rounds, showcasing their ability to control and adapt to various situations. They won on the maps Vertigo, Overpass. They also successfully set 5 bombs during the match.
The standout players for Singularity were POLO contributed 63 kills and nestee contributed 62 kills. Their exceptional skills played a pivotal role in securing the win. Thanks to coordinated effort, the team inflicted 31157 overall damage.
On the defensive side, Singularity held their ground firmly, successfully defending 17 bomb plants. Their defensive coordination and site control proved to be crucial.
Arctic Raptors analytics
The team Arctic Raptors managed to secure 39 out of 80 rounds, but faced challenges in adapting to their opponent's strategies. Capturing 7 plants during the match did not lead the team to victory.
The standout players for Arctic Raptors were AwaykeN contributed 60 kills and ReeGan contributed 52 kills. 27648 of total damage by Arctic Raptors could not prevent Singularity from securing the victory
On the defensive side, Arctic Raptors struggled to hold their ground, successfully defending 18 bomb plants. Their defensive coordination faced challenges, making it difficult to maintain site control.
0 Kommentare