0 Komentarze
Przewaga drużyn
Wynik
5.8
6.6
Train1.5
Wygrane rundy
18
32
Train9
Zabójstwa
159
194
Train28
Obrażenia
18.18K
20.53K
Train2056
Ekonomia
942.55K
1.02M
Train74650
RekordyMecz
Rekord/Czas/Mapa
W/Ś
Ustaw według
Rywal
Zabójstwa za pomocą Desert Eagle na mapie
51.6964
Obrażenia od Deagle Eagle (avg/round)
19.95.4
Zabójstwa za pomocą Desert Eagle na mapie
51.6964
Obrażenia od Deagle Eagle (avg/round)
24.25.4
Eco wygrywa pełny zakup
1
Wynik gracza (runda)
37121012
Strzały (total/round)
9516
Obrażenia (total/round)
40073
Wynik gracza (runda)
38481012
Multikill x-
4
Historyczny Współczynnik wygranych map Ostatnie 6 miesięcy
Informacja
Match analysis of SELECAO vs Jaguares by the Bo3.gg Team
In the CS2 match between SELECAO and Jaguares, a series of thrilling battles unfolded with a score of 0-2, on the following maps: Inferno, Train, and victory was secured by Jaguares. The MVP of this match was TEKO.
Jaguares analytics
The team Jaguares secured 32 out of 50 rounds, showcasing their ability to control and adapt to various situations. They won on the maps Inferno, Train. They also successfully set 4 bombs during the match.
The standout players for Jaguares were TEKO contributed 44 kills and desh contributed 43 kills. Their exceptional skills played a pivotal role in securing the win. Thanks to coordinated effort, the team inflicted 20534 overall damage.
On the defensive side, Jaguares held their ground firmly, successfully defending 16 bomb plants. Their defensive coordination and site control proved to be crucial.
SELECAO analytics
The team SELECAO managed to secure 18 out of 50 rounds, but faced challenges in adapting to their opponent's strategies. Capturing 1 plants during the match did not lead the team to victory.
The standout players for SELECAO were Ikki contributed 44 kills and Pigo contributed 34 kills. 18183 of total damage by SELECAO could not prevent Jaguares from securing the victory
On the defensive side, SELECAO struggled to hold their ground, successfully defending 11 bomb plants. Their defensive coordination faced challenges, making it difficult to maintain site control.
0 Komentarze