0 Komentarze
RekordyMecz
Rekord/Czas/Mapa
W/Ś
Ustaw według
Rywal
Składy
Skład
Starter
Starter
Starter
Starter
Starter
Skład
Historyczny Współczynnik wygranych map Ostatnie 6 miesięcy
Nuke
100%
Mirage
100%
Anubis
67%
Inferno
45%
Ancient
25%
Vertigo
21%
Overpass
10%
Ostatnie 5 map
Nuke
0%
1
9
Mirage
100%
2
3
Anubis
33%
3
7
Inferno
45%
11
0
Ancient
50%
12
1
Vertigo
64%
14
2
Overpass
40%
5
4
Ostatnie 5 map
Nuke
100%
2
1
Mirage
0%
1
4
Anubis
100%
3
0
Inferno
0%
0
5
Ancient
25%
4
0
Vertigo
43%
7
0
Overpass
50%
2
2
Ostatnie wyniki
Łeb w łeb
Poprzednie mecze
- lllww
- llwlw
Informacja
Match analysis of Los Alpacas vs BIG EQUIPA by the Bo3.gg Team
In the CS2 match between Los Alpacas and BIG EQUIPA, a series of thrilling battles unfolded with a score of 2-0, on the following maps: Ancient, Vertigo, and victory was secured by Los Alpacas. The MVP of this match was P3R3IIRA.
Los Alpacas analytics
The team Los Alpacas secured 29 out of 49 rounds, showcasing their ability to control and adapt to various situations. They won on the maps Ancient, Vertigo. They also successfully set 1 bombs during the match.
The standout players for Los Alpacas were P3R3IIRA contributed 44 kills and rafaxF contributed 47 kills. Their exceptional skills played a pivotal role in securing the win. Thanks to coordinated effort, the team inflicted 19991 overall damage.
On the defensive side, Los Alpacas held their ground firmly, successfully defending 10 bomb plants. Their defensive coordination and site control proved to be crucial.
BIG EQUIPA analytics
The team BIG EQUIPA managed to secure 20 out of 49 rounds, but faced challenges in adapting to their opponent's strategies. Capturing 4 plants during the match did not lead the team to victory.
The standout players for BIG EQUIPA were pauliiee contributed 39 kills and Zana contributed 41 kills. 16585 of total damage by BIG EQUIPA could not prevent Los Alpacas from securing the victory
On the defensive side, BIG EQUIPA struggled to hold their ground, successfully defending 8 bomb plants. Their defensive coordination faced challenges, making it difficult to maintain site control.
0 Komentarze