0 Commentaires
Composition de l'équipe
Composition de l'équipe
Titulaire
Titulaire
Titulaire
Titulaire
Titulaire
Composition de l'équipe
Titulaire
Titulaire
Titulaire
Titulaire
Titulaire
Derniers résultats
Face à face
Matchs précédents
- ppg
- gpgp
Avantages des équipes
Historique Taux de victoire par carte 6 derniers mois
Ascent
100%
Lotus
100%
Split
75%
Fracture
50%
Pearl
50%
Icebox
50%
Haven
0%
Dernières 5 cartes
Ascent
100%
2
Lotus
0%
2
Split
100%
2
Fracture
50%
2
Pearl
0%
0
Icebox
0%
1
Haven
0%
1
Dernières 5 cartes
Ascent
0%
1
Lotus
100%
1
Split
25%
4
Fracture
0%
0
Pearl
50%
2
Icebox
50%
2
Haven
0%
1
Informations
Match analysis of Team Liquid vs Karmine Corp by the Bo3.gg Team
In the Valorant match between Team Liquid and Karmine Corp, a series of thrilling battles unfolded with a score of 2-0, on the following maps: Split, Ascent, and victory was secured by Team Liquid. The MVP of this match was .
Team Liquid analytics
The team Team Liquid secured 0 out of 0 rounds, showcasing their ability to control and adapt to various situations. They won on the maps Split, Ascent. They also successfully set 0 bombs during the match.
The standout players for Team Liquid were contributed 0 kills and contributed 0 kills. Their exceptional skills played a pivotal role in securing the win. Thanks to coordinated effort, the team inflicted 0 overall damage.
On the defensive side, Team Liquid held their ground firmly, successfully defending 0 bomb plants. Their defensive coordination and site control proved to be crucial.
Karmine Corp analytics
The team Karmine Corp managed to secure 0 out of 0 rounds, but faced challenges in adapting to their opponent's strategies. Capturing 0 plants during the match did not lead the team to victory.
The standout players for Karmine Corp were contributed 0 kills and contributed 0 kills. 0 of total damage by Karmine Corp could not prevent Team Liquid from securing the victory
On the defensive side, Karmine Corp struggled to hold their ground, successfully defending 0 bomb plants. Their defensive coordination faced challenges, making it difficult to maintain site control.
0 Commentaires