0 Commentaires
Composition de l'équipe
Composition de l'équipe
Derniers résultats
Face à face
Matchs précédents
- ggggg
- pggpg
Historique Taux de victoire par carte 6 derniers mois
Sunset
100%
Fracture
75%
Icebox
67%
Split
60%
Abyss
50%
Ascent
34%
Lotus
21%
Haven
4%
Bind
0%
Pearl
0%
Dernières 5 cartes
Sunset
100%
5
Fracture
75%
4
Icebox
100%
4
Split
100%
3
Abyss
100%
1
Ascent
67%
3
Lotus
88%
8
Haven
71%
7
Bind
0%
1
Pearl
67%
6
Dernières 5 cartes
Sunset
0%
0
Fracture
0%
1
Icebox
33%
3
Split
40%
5
Abyss
50%
2
Ascent
33%
6
Lotus
67%
6
Haven
67%
12
Bind
0%
0
Pearl
67%
3
Informations
Match analysis of RIDDLE ORDER vs QT DIG∞ by the Bo3.gg Team
In the Valorant match between RIDDLE ORDER and QT DIG∞, a series of thrilling battles unfolded with a score of 2-0, on the following maps: Ascent, Icebox, and victory was secured by RIDDLE ORDER. The MVP of this match was JoxJo.
RIDDLE ORDER analytics
The team RIDDLE ORDER secured 26 out of 38 rounds, showcasing their ability to control and adapt to various situations. They won on the maps Ascent, Icebox. They also successfully set 0 bombs during the match.
The standout players for RIDDLE ORDER were JoxJo contributed 40 kills and Seoldam contributed 39 kills. Their exceptional skills played a pivotal role in securing the win. Thanks to coordinated effort, the team inflicted 28076 overall damage.
On the defensive side, RIDDLE ORDER held their ground firmly, successfully defending 18 bomb plants. Their defensive coordination and site control proved to be crucial.
QT DIG∞ analytics
The team QT DIG∞ managed to secure 12 out of 38 rounds, but faced challenges in adapting to their opponent's strategies. Capturing 2 plants during the match did not lead the team to victory.
The standout players for QT DIG∞ were Gwangboong contributed 28 kills and NOBITA contributed 20 kills. 19052 of total damage by QT DIG∞ could not prevent RIDDLE ORDER from securing the victory
On the defensive side, QT DIG∞ struggled to hold their ground, successfully defending 6 bomb plants. Their defensive coordination faced challenges, making it difficult to maintain site control.
0 Commentaires