0 Commentaires
Records Vertigo
Record/Temps/Carte
Val/M
Établi par
Adversaire
Éliminations avec AK47 en moyenne par carte
136.732
Dégâts avec AK47 en moyenne (par tour)
80.425.3
Éliminations avec USP en moyenne par carte
31.616
Dégâts avec USP en moyenne (par tour)
17.94.6
Éliminations avec Glock en moyenne par carte
31.4398
Dégâts avec Glock en moyenne (par tour)
18.73.8
Dégâts des cocktails Molotov en moyenne (par tour)
6.92
Éblouissements par flash en moyenne sur une carte (opp)
4430
Leurres lancés en moyenne
31.291
Dégâts avec Galil en moyenne (par tour)
18.85.6
Informations
Map Analysis of RBG vs ONET4P by the Bo3.gg Team
RBG on Vertigo Analysis
RBG demonstrated their prowers on Vertigo, securing 15 out of 16 rounds, showcasing their ability to control and adapt to various situations on this specific map. Victory on this map contributed to their overall success in the match.
The standout players for RBG on Vertigo were HexT, who contributed 22 kills, and jitter, who added 18 kills to the team's efforts. Their exceptional skills and coordination were instrumental in securing the map win. Throughout the match on Vertigo, the team inflicted a total of 7280 overall damage.
On the defensive side of Vertigo, RBG held their ground firmly, successfully defending 2 bomb plants. Their defensive coordination and site control on this map proved to be crucial in their victory.
ONET4P on Vertigo Analysis
Vertigo proved to be a challenging battleground for ONET4P, as they managed to secure 1 out of 16 rounds on this map. Adapting to their opponent's strategies on this particular map presented difficulties for them.
The standout players for ONET4P on Vertigo included walker, who contributed 11 kills, and consti, who added 9 kills. Despite their individual efforts, inflicting 4508 total damage, ONET4P couldn't prevent RBG from securing victory on Vertigo
On the defensive side of Vertigo, ONET4P struggled to hold their ground, successfully defending 1 bomb plants. Their defensive coordination faced challenges on this map, making it difficult to maintain site control.
0 Commentaires