0 Commentaires
Records Vertigo
Record/Temps/Carte
Val/M
Établi par
Adversaire
Plantation de bombe rapide (sec)
00:27s01:30s
Dégâts avec Galil en moyenne (par tour)
18.75.6
Dégâts des grenades HE en moyenne (par tour)
11.73.4
Dégâts avec Glock en moyenne (par tour)
13.43.8
Victoires éco contre achat complet
1
Multikills x-
4
Dégâts des grenades HE (total/round)
9126.8
Dégâts des grenades HE (total/round)
9426.8
Durée des éblouissements par flash sur un round (sec)
00:17s00:05s
Désamorçage à la dernière seconde
02:13s
Informations
Map Analysis of MASONIC vs UNGENTIUM by the Bo3.gg Team
UNGENTIUM on Vertigo Analysis
UNGENTIUM demonstrated their prowers on Vertigo, securing 16 out of 24 rounds, showcasing their ability to control and adapt to various situations on this specific map. Victory on this map contributed to their overall success in the match.
The standout players for UNGENTIUM on Vertigo were Prism, who contributed 27 kills, and GruBy, who added 19 kills to the team's efforts. Their exceptional skills and coordination were instrumental in securing the map win. Throughout the match on Vertigo, the team inflicted a total of 10177 overall damage.
On the defensive side of Vertigo, UNGENTIUM held their ground firmly, successfully defending 9 bomb plants. Their defensive coordination and site control on this map proved to be crucial in their victory.
MASONIC on Vertigo Analysis
Vertigo proved to be a challenging battleground for MASONIC, as they managed to secure 8 out of 24 rounds on this map. Adapting to their opponent's strategies on this particular map presented difficulties for them.
The standout players for MASONIC on Vertigo included Tauson, who contributed 18 kills, and Vester, who added 18 kills. Despite their individual efforts, inflicting 8144 total damage, MASONIC couldn't prevent UNGENTIUM from securing victory on Vertigo
On the defensive side of Vertigo, MASONIC struggled to hold their ground, successfully defending 2 bomb plants. Their defensive coordination faced challenges on this map, making it difficult to maintain site control.
0 Commentaires